headerphoto

Adjacent Projects

DLRCC New Metals Walkway

2nd August 2009

Bridge Removed

DLRCC Metals Project New Metals After Bridge Removed
DLRCC Metals Project New Metals After Bridge Removed
135.24 KB

Before Removal of Bridge

DLRCC Metals Project New Metals Bridge before work commenced
DLRCC Metals Project New Metals Bridge before work commenced
186.94 KB

Royal St. George Yacht Club Development April 2008

Royal St. George Yacht Club Development 1
RStGYC Development 1
1,288,913

Commissioners Irish Lights

Commissioners of Irish Lights Salutem Omnium
EST 1786

The Commissioners of Irish Lights Development

On 4 January 2006, the contractor, Bowen Construction Ltd, moved into the site to commence construction of Phase 1 of the development. Phase 1 works, in the western half of the site, included building the new Engineering Operations Building comprising the buoy production workshop, painting facility, mechanical workshop, electrical-electronic workshop, stores, and washing and changing rooms. This phase also included the construction of a new buoy pit, a new buoy wash area, and dedicated waste storage area.

The contractor commenced work on Phase 2 at end of October 2006. Bowen Construction Ltd has taken possession of the eastern part of the site and has erected a demarcation hoarding between sites. At the time of writing the contractor has completed demolition of the remaining part of the old buoy shed and workshops, the forge, and the paint workshop at the eastern end of the site. A piling rig has completed the piling works for the foundations of the new circular Office Building and the link corridor to the Engineering Operations Building. The new circular office frame can be viewed in the photographs.

Progress of works:

For further details about the Commissioners of Irish Lights:

Royal Marine Hotel Re-Opening In Spring 2007

Royal Marine Hotel Logo
EST 1828

The new look Royal Marine Hotel will be fully restored to its former Victorian glory, read the full article

For further details about the Royal Marine Hotel

 

CURRENT HARBOUR WEATHER

  • Date: 2012-02-04
  • Time: 16:19 hrs GMT
  • Tide Height: 1.677 m
  • Swell Height: 0.122 m at 3.5 s
  • Wind Bearing: 244 °
  • Wind Direction: WSW
  • Wind Speed: 7.8 kts
  • Beaufort: 3
  • Wind Gust: 16.4 kts
  • Air Temperature: 10.5 °
  • Humidity: 72 %
  • Pressure: 1019.7 hPa
  • Rainfall: 0.4 mm
  • Sun Hours: 00:00 hrs:mm
  • Solar Radiation: 10 W/m2
  • West South West (WSW) 244°
STENA LINE - DUN LAOGHAIRE HOLYHEAD ROUTE SUSPENDED
from: 6th Sep 2011 to 1st Apr 2012
published: 12th Jan 2012

Following the HSS "Stena Explorer" 11:50 arrival and 13:15 departure on Tuesday 13 September the service was suspended until 1 April 2012

Dun Laoghaire Harbour Company Masterplan
from: 13th Jun 2011 to 31st Aug 2011
published: 24th Oct 2011

Watch the video

New publication - Holyhead to Ireland
from: 13th Feb 2011 to 30th Nov -0001
published: 25th Mar 2011

In Holyhead to Ireland, the authors aim to place on record the heritage on which today's successful port and trade is built - the era of railway ownership, for it is without doubt that Holyhead and the Stena Line routes to Ireland owe their existence to the railway companies of yesteryear.

Improvements to Dun Laoghaire Town
from: 18th Aug 2010 to 31st Dec 2010
published: 27th Jun 2011

Work is ongoing on civil improvements to paving on Crofton and Marine Roads. Work has also commenced on landscaping the recently covered area of the railway - The Metals - and the second phase of the covering is about to be slabbed

The East Pier Heritage Audio Guide Tour
from: 26th Aug 2010 to 26th Oct 2010
published: 16th Jan 2011

TwinTrackMedia, in conjunction with Dun Laoghaire Harbour Company, launched this 14 stop audio guide on Thursday 26 August 2010

iOpener Audio Guide Tour
from: 1st Sep 2010 to 1st Sep 2010
published: 16th Jan 2011

An 8 stop audio guide tour published bt the Dun Laoghaire rathdown CC is available