headerphoto

Adjacent Projects

DLRCC New Metals Walkway

2nd August 2009

Bridge Removed

DLRCC Metals Project New Metals After Bridge Removed
DLRCC Metals Project New Metals After Bridge Removed
135.24 KB

Before Removal of Bridge

DLRCC Metals Project New Metals Bridge before work commenced
DLRCC Metals Project New Metals Bridge before work commenced
186.94 KB

Royal St. George Yacht Club Development April 2008

Royal St. George Yacht Club Development 1
RStGYC Development 1
1,288,913

Commissioners Irish Lights

Commissioners of Irish Lights Salutem Omnium
EST 1786

The Commissioners of Irish Lights Development

On 4 January 2006, the contractor, Bowen Construction Ltd, moved into the site to commence construction of Phase 1 of the development. Phase 1 works, in the western half of the site, included building the new Engineering Operations Building comprising the buoy production workshop, painting facility, mechanical workshop, electrical-electronic workshop, stores, and washing and changing rooms. This phase also included the construction of a new buoy pit, a new buoy wash area, and dedicated waste storage area.

The contractor commenced work on Phase 2 at end of October 2006. Bowen Construction Ltd has taken possession of the eastern part of the site and has erected a demarcation hoarding between sites. At the time of writing the contractor has completed demolition of the remaining part of the old buoy shed and workshops, the forge, and the paint workshop at the eastern end of the site. A piling rig has completed the piling works for the foundations of the new circular Office Building and the link corridor to the Engineering Operations Building. The new circular office frame can be viewed in the photographs.

Progress of works:

For further details about the Commissioners of Irish Lights:

Royal Marine Hotel Re-Opening In Spring 2007

Royal Marine Hotel Logo
EST 1828

The new look Royal Marine Hotel will be fully restored to its former Victorian glory, read the full article

For further details about the Royal Marine Hotel

 

CURRENT HARBOUR WEATHER

  • Date: 2010-09-02
  • Time: 19:21 hrs GMT
  • Tide Height: 2.912 m
  • Wind Bearing: 140 °
  • Wind Direction: SE
  • Wind Speed: 11.3 kts
  • Beaufort: 4
  • Wind Gust: 15.6 kts
  • Air Temperature: 15.9 °
  • Humidity: 78 %
  • Pressure: 1018.2 hPa
  • Rainfall: 0.1 mm
  • Sun Hours: 10:35 hrs:mm
  • Solar Radiation: 0 W/m2
  • South East (SE) 140°
HARBOUR INTERNET DOWN
from: 1st Sep 2010 to 2nd Sep 2010
published: 1st Sep 2010

Please note that due to circumstances beyond our control the Din Laighaire Harbour Company are unable to receive or send emails. It is not known at this time when system will be back. Apologies for any inconvenience caused

Webcam data temporarily suspended
from: 30th Aug 2010 to 1st Sep 2010
published: 30th Aug 2010

Webcam streaming data to the Dun Laoghaire Harbour website is temporarily suspended. Normal service will be resumed as soon as possible. Apologies for inconvenience caused

The East Pier Heritage Audio Guide Tour
from: 26th Aug 2010 to 26th Oct 2010
published: 30th Aug 2010

TwinTrackMedia, in conjunction with Dun Laoghaire Harbour Company, launched this 14 stop audio guide on Thursday 26 August 2010. Another 8 stop audio guide published by the DLRCoCo in 2008 is available at http://www.iopener.ie/dunlaoghaire.html

ANNUAL HARBOUR SWIM POSTPONED TO SUNDAY 19 SEPTEMBER 2010
from: 26th Sep 2010 to 26th Sep 2010
published: 2nd Sep 2010

This event has now been re-scheduled for Sunday 19 September 2010

Improvements to Dun Laoghaire Town
from: 18th Aug 2010 to 31st Dec 2010
published: 18th Aug 2010

Work has commenced on civil improvements to paving on Crofton and Marine Roads. Work will soon resume on landscaping the recently covered area of the railway - The Metals

Mountains to Sea dlr Book Festival
from: 7th Sep 2010 to 12th Sep 2010
published: 30th Aug 2010

MOUNTAINS TO SEA - dlr Book Festival The book festival not to miss. If you did miss it in 2009 please see link below, on which podcasts of many of the public addresses are available