headerphoto

Projects

Harbour Square Formerly known as Harbour Yard

Sea View
Harbour Yard Project
41.03 KB

Restoration - Bandstand and Shelter 2009 - 2010

8th March 2010 Shelter Completed

A Modern Design Classic or Not
A Modern Design or Not
142.76 KB

Bandstand Complete!

Bandstand Detail
Bandstand Detail
71.64 KB

Victoria Fountain Restoration

Victoria Fountain Photograph Copyright David Doyle, 2003, 2004, 2005, 2006, 2007, 2008

East Pier

East Pier Resurfacing Cleanup
East Pier Projects
62,218

Harbour Lodge Development

Interior Views April 2008

Downstairs pantry
Downstairs pantry
942,281

St. Michael Pier pile remediation works

Repairs to the piles under St. Michael Pier is presently taking place.There are a total of 30 pile for repair with 17 completed as of February 2007.

Pile repairs December 2006-07 View 1
St. Michael Pier pile repair works December 2006-07 View 1
19.99 Kb

Storm Damage Repairs 6th November 2006

Work crew and heavy dury machinery

Dun Laoghaire Harbour repair works to the harbour piers. Marine grade concrete is being pumped to vunerable and exposed areas, work is governed by the local tide, with work taking place during low tide.

Public Boatyard 2006

Public boatyard receives infrastructure improvements
Upgrade boatyard entrance; boatyard hoist centre turntable timbers renewed for the public boatyard.

Linkspan Lock Modifications

Linkspan modifications, crane moving crucial component
Modifications to the harbour Linkspan lock

Harbour Yard Development

Logistics
30th March 2006

9th June 2005 - Builders begin construction of the Harbour Yard development
22nd March 2005 - Harbour Lodge Yard before the builders move in

Documents:
Harbour Yard Development works description in MS word file format (25 Kb)
Harbour Yard Development an artists impression available in PDF file format (1.75 Mb)
Harbour View Development Presentation Online

East Pier Projects

Table of contents

Anchor
View the images of the Anchor discovered during the recent East pier resurfacing project

Sundial
View the images of the Sundial feature on the East Pier

Resurfacing Project Final Phase
Final phase

Resurfacing Project
Resurfacing Project Menu
25th August 2005 Part 2
25th August 2005
14th August 2005
22nd July 2005
5th July 2005
19th June 2005
12th June 2005
26th May 2005
14th April 2005
25th March 2005
10th March 2005
26th February 2005
13th February 2005
29th January 2005
28th January 2005
16th January 2005
21st December 2004
16th December 2004
8th November 2004

End Steps:
29th August 2004

Documents:
"East Pier Resurfacing Project Sign" available in PDF file format (1.51 Mb)  PDF File Icon

Carlisle Pier Development

Carlisle Pier Presentation

Carlisle Pier MS Powerpoint presentation, is now available to view online in HTML format.

Documents:

Redevelopment of Carlisle Pier
Exhibition Poster
Brochure Award
Preferred Bidder Shortlist
Submission Deadline
Carlisle Pier Project News Archive

Adjacent Projects

DLRCC New Metals Walkway 2009

Bridge Removed

DLRCC Metals Project New Metals After Bridge Removed
DLRCC Metals Project New Metals After Bridge Removed
135.24 KB

Before Removal of Bridge

DLRCC Metals Project New Metals Bridge before work commenced
DLRCC Metals Project New Metals Bridge before work commenced
186.94 KB

Royal St. George Yacht Club Development April 2008

Royal St. George Yacht Club Development 1
RStGYC Development 1
1,288,913

Commissioner of Irish Lights Development

Additional Images

CIL October 2007
CIL October 2007
89,918

Download Project Documents

The Dún Laoghaire Harbour Company have provided for your information a number of documents referring to past, present and future projects, such as the resurfacing of lower level East Pier schedule. All documents are available to download from the resources pages.

 

 

CURRENT HARBOUR WEATHER

  • Date: 2012-02-04
  • Time: 16:19 hrs GMT
  • Tide Height: 1.677 m
  • Swell Height: 0.122 m at 3.5 s
  • Wind Bearing: 244 °
  • Wind Direction: WSW
  • Wind Speed: 7.8 kts
  • Beaufort: 3
  • Wind Gust: 16.4 kts
  • Air Temperature: 10.5 °
  • Humidity: 72 %
  • Pressure: 1019.7 hPa
  • Rainfall: 0.4 mm
  • Sun Hours: 00:00 hrs:mm
  • Solar Radiation: 10 W/m2
  • West South West (WSW) 244°
STENA LINE - DUN LAOGHAIRE HOLYHEAD ROUTE SUSPENDED
from: 6th Sep 2011 to 1st Apr 2012
published: 12th Jan 2012

Following the HSS "Stena Explorer" 11:50 arrival and 13:15 departure on Tuesday 13 September the service was suspended until 1 April 2012

Dun Laoghaire Harbour Company Masterplan
from: 13th Jun 2011 to 31st Aug 2011
published: 24th Oct 2011

Watch the video

New publication - Holyhead to Ireland
from: 13th Feb 2011 to 30th Nov -0001
published: 25th Mar 2011

In Holyhead to Ireland, the authors aim to place on record the heritage on which today's successful port and trade is built - the era of railway ownership, for it is without doubt that Holyhead and the Stena Line routes to Ireland owe their existence to the railway companies of yesteryear.

Improvements to Dun Laoghaire Town
from: 18th Aug 2010 to 31st Dec 2010
published: 27th Jun 2011

Work is ongoing on civil improvements to paving on Crofton and Marine Roads. Work has also commenced on landscaping the recently covered area of the railway - The Metals - and the second phase of the covering is about to be slabbed

The East Pier Heritage Audio Guide Tour
from: 26th Aug 2010 to 26th Oct 2010
published: 16th Jan 2011

TwinTrackMedia, in conjunction with Dun Laoghaire Harbour Company, launched this 14 stop audio guide on Thursday 26 August 2010

iOpener Audio Guide Tour
from: 1st Sep 2010 to 1st Sep 2010
published: 16th Jan 2011

An 8 stop audio guide tour published bt the Dun Laoghaire rathdown CC is available