headerphoto

Projects

St. Michael Pier Repair Work

Repairs to the piles under St. Michael Pier is presently taking place.There are a total of 30 pile for repair with 17 completed as of February 2007.

St. Michael Pier Pile Repair December 2006
Pile repairs December 2006
38.39 Kb
St. Michael Pier Pile Repairs December 2006
Pile repairs December 2006
45.42 Kb
St. Michael Pier Pile Repair December 2006
Pile repairs December 2006
131.63 Kb

The method employed is quite interesting from an engineering point of view, a nylon sock sealed with a zip is fitted to the concrete pile for repair with a clamp retaining the sock at the sea-bed, the sock is then zipped up to within 1.5 meters of the upper decking of the pier, a series of spacers are strapped to the pile before the sock is zipped up to insure a 100 millimetre spacing is retained between the sock and the surface of the pile, concrete is then pumped into the spacing between the pile and the sock which eventually hardens resulting in an extra layer of concrete 100 millimetre thick sealing / protecting the old pile, the sock is sacrificial.

St. Michael Pier Pile Repairs
All Projects in and around Dun Laoghaire Harbour

 

CURRENT HARBOUR WEATHER

  • Date: 2012-02-04
  • Time: 19:00 hrs GMT
  • Tide Height: 2.827 m
  • Swell Height: 0.138 m at 4.0 s
  • Wind Bearing: 302 °
  • Wind Direction: WNW
  • Wind Speed: 11.6 kts
  • Beaufort: 4
  • Wind Gust: 19.2 kts
  • Air Temperature: 8 °
  • Humidity: 83 %
  • Pressure: 1021.4 hPa
  • Rainfall: 1.1 mm
  • Sun Hours: 00:00 hrs:mm
  • Solar Radiation: 0 W/m2
  • West North West (WNW) 302°
STENA LINE - DUN LAOGHAIRE HOLYHEAD ROUTE SUSPENDED
from: 6th Sep 2011 to 1st Apr 2012
published: 12th Jan 2012

Following the HSS "Stena Explorer" 11:50 arrival and 13:15 departure on Tuesday 13 September the service was suspended until 1 April 2012

Dun Laoghaire Harbour Company Masterplan
from: 13th Jun 2011 to 31st Aug 2011
published: 24th Oct 2011

Watch the video

New publication - Holyhead to Ireland
from: 13th Feb 2011 to 30th Nov -0001
published: 25th Mar 2011

In Holyhead to Ireland, the authors aim to place on record the heritage on which today's successful port and trade is built - the era of railway ownership, for it is without doubt that Holyhead and the Stena Line routes to Ireland owe their existence to the railway companies of yesteryear.

Improvements to Dun Laoghaire Town
from: 18th Aug 2010 to 31st Dec 2010
published: 27th Jun 2011

Work is ongoing on civil improvements to paving on Crofton and Marine Roads. Work has also commenced on landscaping the recently covered area of the railway - The Metals - and the second phase of the covering is about to be slabbed

The East Pier Heritage Audio Guide Tour
from: 26th Aug 2010 to 26th Oct 2010
published: 16th Jan 2011

TwinTrackMedia, in conjunction with Dun Laoghaire Harbour Company, launched this 14 stop audio guide on Thursday 26 August 2010

iOpener Audio Guide Tour
from: 1st Sep 2010 to 1st Sep 2010
published: 16th Jan 2011

An 8 stop audio guide tour published bt the Dun Laoghaire rathdown CC is available