headerphoto

Projects

St. Michael Pier Repair Work

Repairs to the piles under St. Michael Pier is presently taking place.There are a total of 30 pile for repair with 17 completed as of February 2007.

St. Michael Pier Pile Repair December 2006
Pile repairs December 2006
38.39 Kb
St. Michael Pier Pile Repairs December 2006
Pile repairs December 2006
45.42 Kb
St. Michael Pier Pile Repair December 2006
Pile repairs December 2006
131.63 Kb

The method employed is quite interesting from an engineering point of view, a nylon sock sealed with a zip is fitted to the concrete pile for repair with a clamp retaining the sock at the sea-bed, the sock is then zipped up to within 1.5 meters of the upper decking of the pier, a series of spacers are strapped to the pile before the sock is zipped up to insure a 100 millimetre spacing is retained between the sock and the surface of the pile, concrete is then pumped into the spacing between the pile and the sock which eventually hardens resulting in an extra layer of concrete 100 millimetre thick sealing / protecting the old pile, the sock is sacrificial.

St. Michael Pier Pile Repairs
All Projects in and around Dun Laoghaire Harbour

 

CURRENT HARBOUR WEATHER

  • Date: 2010-09-02
  • Time: 19:24 hrs GMT
  • Tide Height: 2.887 m
  • Wind Bearing: 143 °
  • Wind Direction: SE
  • Wind Speed: 11.3 kts
  • Beaufort: 4
  • Wind Gust: 15.6 kts
  • Air Temperature: 15.9 °
  • Humidity: 79 %
  • Pressure: 1018.2 hPa
  • Rainfall: 0.1 mm
  • Sun Hours: 10:35 hrs:mm
  • Solar Radiation: 0 W/m2
  • South East (SE) 143°
HARBOUR INTERNET DOWN
from: 1st Sep 2010 to 2nd Sep 2010
published: 1st Sep 2010

Please note that due to circumstances beyond our control the Din Laighaire Harbour Company are unable to receive or send emails. It is not known at this time when system will be back. Apologies for any inconvenience caused

Webcam data temporarily suspended
from: 30th Aug 2010 to 1st Sep 2010
published: 30th Aug 2010

Webcam streaming data to the Dun Laoghaire Harbour website is temporarily suspended. Normal service will be resumed as soon as possible. Apologies for inconvenience caused

The East Pier Heritage Audio Guide Tour
from: 26th Aug 2010 to 26th Oct 2010
published: 30th Aug 2010

TwinTrackMedia, in conjunction with Dun Laoghaire Harbour Company, launched this 14 stop audio guide on Thursday 26 August 2010. Another 8 stop audio guide published by the DLRCoCo in 2008 is available at http://www.iopener.ie/dunlaoghaire.html

ANNUAL HARBOUR SWIM POSTPONED TO SUNDAY 19 SEPTEMBER 2010
from: 26th Sep 2010 to 26th Sep 2010
published: 2nd Sep 2010

This event has now been re-scheduled for Sunday 19 September 2010

Improvements to Dun Laoghaire Town
from: 18th Aug 2010 to 31st Dec 2010
published: 18th Aug 2010

Work has commenced on civil improvements to paving on Crofton and Marine Roads. Work will soon resume on landscaping the recently covered area of the railway - The Metals

Mountains to Sea dlr Book Festival
from: 7th Sep 2010 to 12th Sep 2010
published: 30th Aug 2010

MOUNTAINS TO SEA - dlr Book Festival The book festival not to miss. If you did miss it in 2009 please see link below, on which podcasts of many of the public addresses are available